History

Home > About Us > History
  • Development timeline
  • 2015

    116MW CFB boiler listed as NO.1 in the efficient boiler promotion directory, which was published by National Development and Reform Commission( NDRC ).

  • 2014
    Passed the ASME certification and ISO9001 certification review.
  • 2013
    Zhengzhou Boiler Co., Ltd. was selected as 2013 Top 100 Enterprises in Zhengzhou.
  • 2011
    In 2011, The company signed and manufactured its first 240ton/hr CFB power plant boiler.
  • 2009
    Establishment of subsidiary Zhengguo Vessel Co., Ltd.
  • 2008
    In 2008,Zhengzhou Boiler Co., Ltd. was founded.
  • 2006
    Establishment of subsidiary Zhengzhou Zhengguo Installation Engineering Co.,LTD.
  • 2005
    Establishment of subsidiary Zhengzhou Zhengguo Vessel Co., LTD.
  • 2004
    Establishment of subsidiary Zhengzhou Boiler Auxiliaries Co., LTD.Obtained Henan Province High-tech Enterprise Certificate.
  • 2002

    Get A class boiler manufacturing license.ISO 9001-2000 quality management system switch version got success.Become a technological innovation demonstration enterprise in Henan Province.

  • 1999
    Obtained ISO9001-94 Quality Management System Certification. 
  • 1997
    Obtain B-class boiler manufacturing license.
  • 1996
    Winning the World Bank GEF efficient industrial boiler project.
  • 1945

    Zhengzhou Boiler Factory was established